Filter content
by selecting applicable filters below
Indicator 1.2.1
by Contact on 8 October 2026
Requirement
The UoC shall develop, implement and maintain a management system to support the implementation of the ASC Requirements that is appropriate to the size and complexity of the UoC.
How Do I Interpret This Requirement?
-
The scope of the management system should suit the operation that it is designed for. For example:
-
A site situated at a remote distance at sea might not need additional elements in the management system to work with communities, or
-
A site operating a RAS system might not need additional elements in the management system to manage the risks of escapes.
-
-
A management system should include:
-
Policies: explain why a site is operating in such a way.
-
they can be beneficial for employees to understand their rights and duties.
-
it is not necessary to have a policy for every topic in the ASC Farm Standard and sometimes topics are grouped together in one policy.
-
for example, forced labour, child labour, discrimination, collective bargaining and freedom of association and others can all be addressed together through the human rights policy.
-
-
policies are most valuable for topics which are not straightforward in the local context.
-
for example, where employees have an inconsistent or incomplete understanding of an issue, a policy might be needed.
-
-
-
Procedures: explain how a site operates in a certain way and specify how to put policies into operation to ensure the outcome intended.
-
Records: provide an essential source of information for both internal self-assessments and external audits, documenting that policies and procedures have been followed in specific instances.
-
sites can use recording templates to guide the user through all of the steps of a record and provide accurate information in a set format.
-
records should be adequately maintained and controlled, including ensuring only up-to-date versions of documents are used.
-
-
Evidence of Implementation
|
|
|
-
Documents of the management system, including policies, procedures and records.
-
Evidence that demonstrates management’s ownership of the management system (see ???).
Auditors Should Confirm
-
Existence of up-to-date policies, procedures and records.
-
Management’s ownership of the management system:
-
attendance at management reviews (see Indicator 1.2.4).
-
active role in the development, implementation and maintenance of the management system.
-
demonstrable during interviews with the management.
-
-
Useful Resources
-
The ISO 9001:2015 management system standards: https://www.iso.org/management-system-standards.html
-
Plan Do Check Act Cycle: https://asq.org/quality-resources/pdca-cycle
