Filter content
by selecting applicable filters below
Indicator 2.4.3
by Contact on 8 October 2026
Requirement
The UoC shall carry out a site-specific handling and containment risk assessment, approved by a member of management, following the method outlined in Appendix 3.
How Do I Interpret This Requirement?
-
This Indicator requires the UoC to conduct a site-specific risk assessment to proactively identify and mitigate risks associated with handling and containment of cultured animals. The Indicator emphasises the need for tailored evaluation rather than a generic approach as site-specific circumstances might require different responses. Management approval ensures that the assessment is formally reviewed, acknowledged and integrated into wider management structures.
Evidence of Implementation
-
Documentational evidence of a risk assessment, the identification of appropriate risk levels and any mitigation actions taken (including the implementation thereof). The evidence should also include proof of management approval and periodic review of the risk assessment to ensure that it remains relevant.
Auditors Should Confirm
-
Presence of a documented risk assessment, which:
-
Is specific to the conditions of the site.
-
Covers all handling and containment risks.
-
-
That the risk assessment identifies:
-
Risk factors and the associated risk levels.
-
Mitigation actions and records the implementation, including the desired outcome (i.e. reduction of risk level).
-
That the risk assessment is approved (e.g. signed off) by management and shows evidence of periodic review to keep it relevant.
-
