Appendix 5 – Methods for Calculating Phytoplankton Depletion by Bivalve Culture
Appendix 5 – Methods for Calculating Phytoplankton Depletion by Bivalve Culture
This Appendix details the method for the calculation of phytoplankton depletion in waterbodies required in Criterion 2.2.
|
Section |
|---|
|
5.1 Introduction |
|
5.2 Estimating the zone of influence |
|
5.3 Primary Production Time (PPT) calculation |
5.1 Introduction
As filter-feeders, bivalves depend on the natural abundance of phytoplankton for feeding. In situations where bivalve aquaculture exceeds the ability of the waterbody to provide for sufficient phytoplankton for both natural bivalve populations and cultured populations, the carrying capacity can be exceeded and depletion can occur. Within this Appendix, various calculations are provided to determine if phytoplankton depletion occurs within a waterbody.
If the renewal of water, or Retention Time (RT), is faster than water clearance, or Clearance Time (CT) (CT>RT), it is expected that the carrying capacity of a waterbody will not be exceeded and phytoplankton depletion will not occur as sufficient replenishment is occurring.
To determine phytoplankton depletion, the site is required to estimate its zone of influence. Section 5.2 outlines the method to estimate the zone of influence of the site and determine RT and CT.
If CT<RT, as determined in Section 5.2, cultured bivalves may negatively impact carrying capacity; therefore, an additional method is required to link CT to Primary Production Time (PPT). The method to determine PPT is outlined in Section 5.3.
5.2 Estimating the zone of influence (Indicator 2.2.11)
The UoC shall use one of the following two methods to determine the zone of influence of the site.
Method 1
If the site is in an easily definable waterbody, for example an estuary or bay, and has tidally dominated water exchange, the steps to determine the zone of influence are as follows:
-
Calculate the mean depth at high tide and the surface area of the waterbody.
-
Calculate the volume of the waterbody (Vt) as the depth multiplied by the surface area at high tide.
-
Calculate RT using the following formula:
Where:
-
P is the tidal periodicity, the length of the tidal cycle (days) (e.g. ~0.5 days for semidiurnal tides); and
-
ln is the natural logarithm; and
-
Vl is the total volume of the waterbody at low tide (litres); and
-
Vt is the total volume of the waterbody at high tide (litres).
-
-
Calculate CT using the following formula:
Where:
-
Vt is the total volume of the waterbody at high tide (litres); and
-
N is number of bivalves; and
-
C is average clearance rate (litres/individual species/day) at harvest size.
-
Method 2
Where there are no clear boundaries to the waterbody, or if it is located some distance offshore, the steps to determine the zone of influence are as follows:
-
Calculate the ‘radius of influence’ (RI) as the cumulative current speed over a 24-hour period.
-
Calculate the volume of the waterbody (Vt) by assuming a circular surface area multiplied by the depth (Vt = (pi x RI2) x depth). If the area is in deep waters, the depth used shall be that defining the lower limits of phytoplankton growth (‘lower growth line’).
-
RT = 24 hours.
-
Calculate CT using the following formula:
Where:
-
Vt is the total volume of the waterbody at high tide (litres); and
-
N is number of bivalves; and
-
C is average clearance rate (litres/individual species/day) at harvest size.
-
5.3 Primary Production Time (PPT) calculation (Indicator 2.2.11)
PPT shall be determined per site, either by calculating its value using the formula outlined below, or from values derived from secondary data.
Where:
-
B is the yearly averages of phytoplankton biomass; and,
-
PPP is the phytoplankton primary production (PPP) within the system.
Appendix 4 – Allowance for siting in PAs
This Appendix details the conditions under which siting in various types of Protected Areas (PAs) are allowed (Indicator 2.2.1).
|
Section |
|---|
|
4.1 Introduction |
|
4.2 Conditional allowances |
4.1 Introduction
As part of the development of the ASC Farm Standard, research has been initiated to better understand which types of aquaculture production systems are conditionally allowed in the various types of PAs.
At the time of publication of ASC Farm Standard v1.1, this work is still ongoing and not yet available for implementation.
Therefore, the conditional allowances listed below are taken from the ASC species standards and will be replaced with aligned conditional allowances in a future version of the ASC Farm Standard.
4.2 Conditional allowances (Indicator 2.2.1)
|
Species group |
Conditional allowances |
|---|---|
|
Salmonids – marine Salmo spp. Oncorhynchus spp. Salvelinus spp. Seabass, Seabream, Meagre Dicentrarchus spp. Sparus spp. Pagrus spp. Argyrosomus spp. Flatfish Paralichthys spp. Pseudopleuronectes spp. Hippoglossus spp. Scophthalmus spp. Tropical Marine Finfish Epinephelus spp. Cromileptes spp. Plectropomus spp. Cephalopholis spp. Lutjanus spp. Ocyurus spp. Trachinotus spp. Lates spp. Larimichthys spp. Cod Gadus morhua |
Siting in PAs is not allowed. An exception applies if sites are:
|
|
Salmonids – freshwater Salmo spp. Oncorhynchus spp. Salvelinus spp. Thymallus spp. Coregonus spp. Pike-perch Sander lucioperca |
Siting in PAs is not allowed. An exception applies if sites are:
|
|
Seriola and Cobia Seriola spp. Rachycentron canadum |
Siting in PAs is not allowed. An exception applies if sites are:
|
|
Crustaceans Penaeus spp. P. vannamei Cherax spp. Procambarus spp. Astacus spp. Macrobrachium spp: |
Siting in PAs is not allowed. An exception applies if sites are:
For both allowances, the following conditions apply:
|
Appendix 3 – Method for risk management
This Appendix provides the method for risk management and the requirements for conducting an Environmental Risk Assessment (ERA) and a Health and Safety Risk Assessment (HSRA).
|
Section |
|---|
|
3.1 Introduction |
|
3.2 Risk assessment method |
|
3.3 Environmental Risk Assessment (Indicators 2.1.1 and 2.1.2) |
|
3.4 Health and Safety Risk Assessment (Indicator 3.5.1) |
3.1 Introduction
A Risk Management Framework is a structured method used to assess and control risks in a systematic and consistent manner. It helps to understand how likely and severe a risk is so that steps can be taken to reduce or prevent it. Conducting risk assessments helps individuals and companies in the aquaculture industry become aware of risks and improve operational processes. The main steps involve identifying risks, assessing the risk level, implementing control measures, monitoring, regularly reviewing and updating the assessment to ensure its effectiveness.
3.2 Risk Assessment Method
Step 1 – Identify the risks
The site shall identify the risk factors (the ‘risks’ or ‘issues’) that are relevant to its context. These risk factors are usually related to a wider theme (e.g. environmental risks) and are either generic or specific to the context of the site.
Examples of risk factors are:
-
Negative wildlife interaction (environmental).
-
Physical harm due to contact with hazardous chemicals (health and safety).
For each risk factor, information regarding the following shall be considered:
-
The evidence used to score the risk level.
-
What or who could be impacted by the risk factor.
-
What are the risk drivers of the risk level (i.e. what drives the risk).
-
Existing control measures.
Step 2 – Assess the risk level
The risk level is determined by scoring the elements of likelihood and severity of each identified risk.
Once the likelihood and severity of the identified risks has been assessed, each risk factor is scored in a risk matrix. A typical risk matrix consists of three levels (low, medium, high) for each element (see example Table 1).
Table 1. Example of a 3*3 risk matrix.
|
Risk Severity |
||||
|---|---|---|---|---|
|
Low |
Medium |
High |
||
|
Risk Likelihood |
Low |
Low Risk |
Low Risk |
Medium Risk |
|
Medium |
Low Risk |
Medium Risk |
High Risk |
|
|
High |
Medium Risk |
High Risk |
High Risk |
|
Likelihood is the estimated probability that a risk will materialise into an incident, impact, injury, illness, damage or other negative outcome, or how probable the event is to occur under given conditions. It answers the question: “How often could this risk occur?”.
-
Low likelihood is where an event could occur, but is unlikely to occur under normal site conditions and existing control measures.
-
Medium likelihood is where an event could occur occasionally under normal site conditions and existing control measures.
-
High likelihood is where an event is expected to occur, occurs frequently, or is likely to occur under current site conditions or existing control measures.
Severity is the estimated potential impact or consequence of a risk if it materialises into an incident, impact, injury, illness, damage or other negative outcome. Severity focuses on reasonably foreseeable consequence of the event, regardless of how likely it is to occur. It answers the question: “How serious would the outcome be if this risk occurs?”.
-
Low severity is a minor, localised, short-term or easily corrected consequence.
-
Medium severity is a moderate consequence requiring corrective action, treatment, notification, or additional monitoring.
-
High severity is a severe, widespread, long-term, irreversible or legally significant consequence.
Step 3 – Implement control measures
Control measures shall be defined and implemented for all risk factors rated as ‘medium’ or ‘high’ to reduce their risk levels over time.
Risk levels shall be reduced using the following control measures:
-
Mitigation measures: reducing the risk level when the risk factor cannot be eliminated fully; or
-
Remediation measures: reducing the risk level to a point where the risk factor no longer is relevant.
Step 4 – Monitor control measures
The implemented control measures shall be monitored to ensure their effectiveness in reducing the risk level.
Step 5 – Review
Regular review of the control measures and risk levels shall be conducted, and revisions made where necessary, including under at least the following circumstances:
-
When related timelines have expired
-
When triggered by the monitoring outcome
-
When changes occur that influence the relevance of site-specific risk factors.
3.3 Environmental Risk Assessment (Indicators 2.1.1 and 2.1.2)
The decision tree in Appendix 3.3.1 identifies the applicable assessment route and the requirements for the person conducting the ERA. Together with the additional ERA requirements in Appendix 3.3.2, the ERA shall be site-specific and shall follow the risk assessment method in Appendix 3.2.
3.3.1 Decision Tree
The following decision tree determines whether:
-
an existing legally required Environmental Impact Assessment (EIA), or equivalent legal environmental assessment, can be used to demonstrate conformance with Indicator 2.1.1;
-
additional components are required to supplement an existing legally required EIA, or equivalent legal environmental assessment, to adhere to the method in Appendix 3 (3.2 and 3.3.2); or
-
an independent person shall conduct the ERA, demonstrating conformance with Indicator 2.1.2.
3.3.2 Environmental Risk Assessment
In addition to the Risk Assessment Method outlined in Section 3.2, the site shall adhere to the following requirements for conducting an Environmental Risk Assessment (ERA).
Related to Step 1:
The following risk factors shall be considered as a minimum in conducting an ERA:
Habitat-related:
-
Presence of Protected Areas (see Indicator 2.2.1) and risk drivers that increase the likelihood of negative impacts upon these.
-
Presence of Critical Habitats (see Indicator 2.2.2) and risk drivers that increase the likelihood of negative impacts upon these.
-
Presence of Sensitive Habitats (see Indicator 2.2.4) and risk drivers that increase the likelihood of negative impacts upon these. As a minimum, the following sensitive habitats shall be considered:
-
Seagrass habitats (see Indicator 2.2.5); and
-
Areas containing biogenic structures that are not particularly adapted to sedimentation or organic enrichment (e.g. tubeworm mounds, bryozoan mounds, bivalve beds and reefs or sponge gardens that form a structure for other epifauna).
-
-
Presence of Wildlife Corridors (see Indicator 2.2.6) and risk drivers that increase the likelihood of negative impacts upon these.
-
The minimum width of the riparian zone between the site and any confined or linear waterbody (see Indicator 2.2.7).
-
The minimum width of the coastal barrier between the site and any large or open waterbody (see Indicator 2.2.8).
-
The conversion of natural wetland before and after 1999 (see Indicators 2.2.9 and 2.2.10).
Wildlife-related:
-
Presence of mammals, elasmobranchs, birds, amphibians or reptiles and farm-related drivers which increase the likelihood of Human-Wildlife Conflict (see Indicator 2.3.1) or other negative impacts upon these (see Indicator 2.3.3).
-
Presence of Threatened Species (see Indicator 2.3.2) and risk drivers that increase the likelihood of negative impacts upon these.
Related to Step 2:
See Section 3.3.1 for the competencies of the person conducting the ERA.
Related to Step 3:
In addition to the requirements prescribed in the Risk Assessment Method outlined in Section 3.2, Risk level reduction shall be completed within the following timelines:
-
For ‘high’ risk level – reduce to ‘medium’ within a short period (for example 6-9 months after detection).
-
For ‘medium’ risk level – reduce to ‘low’ within a medium period (for example 12-18 months after detection).
Where a ‘medium’ risk cannot reasonably be reduced to ‘low’, the UoC shall document the justification, demonstrate that all reasonably practicable control measures have been implemented, and continue to monitor and review of the residual risk.
Related to Step 4:
No additional requirements beyond those prescribed in the Risk Assessment Method outlined in Section 3.2.
Related to Step 5:
No additional requirements beyond those prescribed in the Risk Assessment Method outlined in Section 3.2.
3.4 Health and Safety Risk Assessment (Indicator 3.5.1)
In addition to the Risk Assessment Method outlined in Section 3.2, the site shall adhere to the following requirements for conducting a Health and Safety Risk Assessment (HSRA).
Related to Step 1:
The following risk factors shall be considered as a minimum in conducting an HSRA:
|
Chemical and biological
Diving Electricity and electrical equipment Other equipment
Fire |
Mechanical and manual handling
Natural/physical disaster/event
Welfare
|
Workplace
Workplace Environment
|
Related to Step 2:
-
Assess the risk level for the occurrence of acute and chronic injury or damage.
-
See Indicator 3.5.2 for the competencies of the person conducting the HSRA.
Related to Step 3
Control measures to reduce the risk level should be taken as soon as is possible.
Related to Step 4:
No additional requirements beyond those prescribed in the Risk Assessment Method outlined in Section 3.2.
Related to Step 5:
No additional requirements beyond those prescribed in the Risk Assessment Method outlined in Section 3.2.
Appendix 2 – Species-specific Performance Metrics
This Appendix lists the species-specific performance metrics for all relevant Indicators.
The metrics are set at genus or family level, or at a unique species level. The UoC shall adhere to the metric that is relevant to the cultured species.
The metrics are reviewed and revised according to the ASC Metrics Methodology. ASC relies on data as a backbone for the Programme Development and Revision Procedure, requiring farms to submit data in accordance with the ASC Data Submission Procedure.
|
Section |
|---|
|
2.1 Total Nitrogen (TN) and Total Phosphorous (TP) release (Indicator 2.6.1) |
|
2.2 Feed efficiency (Indicator 2.12.5) |
|
2.3 Mortality limits and Survival Rates (Indicator 4.1.1.6 and 4.2.1.4) |
|
2.4. Maximum fasting duration (Indicator 4.1.2.16 and 4.1.2.31) |
|
2.5 Antibiotic and parasiticide treatments (Indicator 4.4.14 and 4.4.15) |
2.1 Total Nitrogen (TN) and Total Phosphorous (TP) release (Indicator 2.6.1)
The formulae for calculating TP and TN are explained in Appendix 8.2.
Crustaceans
Penaeus spp.: TP: <5.4kg/t (except P. vannamei) TN <32.4kg/t
P. vannamei: TP: <3.9kg/t TN: <25.2kg/t
Cherax spp. Procambarus spp. Astacus spp. TP: <4.0kg/t TN: <26.1kg/t
Macrobrachium spp: TP: <6.1kg/t TN: <39.2kg/t
Pangasius
All systems: TP: ≤7.2kg/t TN: ≤27.5kg/t
Salmonids – freshwater
Land-based systems TP: ≤4kg/t
Cages TP: ≤5kg/t
Tilapia
All systems TP: ≤20kg/t
2.2 Feed efficiency (Indicator 2.12.5)
The formulae for calculating feed efficiency are explained in Appendix 15.
Crustaceans
Penaeus spp.: FFDRm: ≤1.8 (except P. vannamei)
P. vannamei: FFDRm: ≤1.3
Cherax spp. Procambarus spp. Astacus spp. FFDRm: ≤1.4
Macrobrachium spp: FFDRm: ≤2.1
Molluscs
Haliotis spp.: FFDRm: ≤0.8 FFDRo: ≤0.8
Flatfish
Paralichthys spp. Pseudopleuronectes spp. FFDRm: ≤1.6 FFDRo: ≤2.0
Hippoglossus spp. FFDRm: ≤2.0 FFDRo: ≤3.0
Scophthalmus spp. FFDRm: ≤2.5 FFDRo: ≤3.0
Pangasius
Pangasiidae: FFDRm: ≤0.5 FFDRo: ≤0.5 (complete production cycle)
Pike-perch
Sander lucioperca: FFDRm: ≤2.3 FFDRo: ≤2.95
Salmonids – freshwater
Salmo spp. Oncorhynchus spp. Salvelinus spp. Thymallus spp. Coregonus spp. FFDRm: ≤1.5 FFDRo: ≤2.95 OR max EPA + DHA content ≤9% from marine sources as percentage of fatty acids in the feed
Salmonids – marine
Salmo spp. Oncorhynchus spp. Salvelinus spp. FFDRm: ≤1.2 FFDRo: ≤2.52 OR EPA+DHA: <30g/kg feed
Seabass, Seabream, Meagre
Sparus spp.
Dicentrarchus spp. FFDRm: ≤1.85 FFDRo: ≤2.9
Pagrus spp. FFDRm: ≤2.5 FFDRo: ≤2.9
Argyrosomus spp. FFDRm: ≤2.35 FFDRo: ≤2.9
Seriola and Cobia
Seriola spp. Rachycentron canadum FFDRm: ≤2.9 FFDRo: ≤2.9
Tilapia
Oreochromis spp. Tilapia spp. Coptodon spp. FFDRm: ≤0.8 FFDRo: ≤0.8
Tropical Marine Finfish
Epinephelus spp. Cromileptes spp. Plectropomus spp. Cephalopholis spp. Lutjanus spp. Ocyurus spp. FFDRm: ≤2.6 FFDRo: ≤2.6
Trachinotus spp. FFDRm: ≤2.0 FFDRo: ≤2.0
Lates spp. FFDRm: ≤1.4 FFDRo: ≤2.0
Larimichthys spp. FFDRm: ≤2.9 FFDRo: ≤3.5
Catfish
Clarius FFDRm <1.0 FFDRo <0.5
Heterobranchus FFDRm <1.3 FFDRo <1.0
Clarius x Heterobranchus FFDRm <1.0 FFDRo <1.3
Ictaluriidae FFDRm <0.4 FFDRo <1.0
Silurus FFDRm <1.0 FFDRo <0.5
Cod FFDRm <2.3 then <2.1 from October 2029 FFDRo <1.0
2.3 Mortality Limits (Indicator 4.1.1.6) and Survival Rates (Indicator 4.2.1.4)
The formulae for calculating mortality limits are explained in Appendix 12 (12.6.1).
Catfish
Based on real percentage mortality
All systems ≤20%
Cod
Based on observed mortality rate
Viral disease related mortality ≤10% Unexplained mortality rate from each of the previous two production cycles, for sites with total mortality >6% ≤40%
Pangasius
Based on real percentage mortality
All systems ≤20%
Salmonids – marine
Based on observed mortality rate
Viral disease related mortality ≤10% Unexplained mortality rate from each of the previous two production cycles, for sites with total mortality >6% ≤40%
Tilapia
Based on real percentage mortality
All systems after they have attained a size of 100g ≤35%
The formulae for calculating survival rates are explained in Appendix 12 (12.6.1)
Crustaceans
Unfed and non-permanently aerated ponds >25% Fed but non-permanently aerated ponds >45% Fed and permanently aerated ponds >65%
2.4 Maximum fasting duration (Indicator 4.1.2.16 and 4.1.2.31)
Catfish
Maximum fasting duration 72h
Pangasius
Maximum fasting duration ≤62° days
Salmonids – marine
Maximum fasting duration ≤54° days
Salmonids – freshwater
Maximum fasting duration ≤54° days
Seabass, Seabream, Meagre
Maximum fasting duration ≤ 45° days if water temperature <15°, otherwise 72h
Seriola and Cobia
Maximum fasting duration
Seriola: 72h
Cobia: ≤ 62° days
Tropical Marine Finfish
Maximum fasting duration 72h
Cleaner Fish
Maximum fasting duration ≤54° days
2.5 Antibiotic and Parasiticide Treatments (Indicators 4.4.14 and 4.4.15)
Catfish
Number of antibiotic treatments ≤3 Number of parasiticide treatments 0
Cod
Gadus Morhua
Number of antibiotic treatments (grow out) ≤3
Number of antibiotic treatments (juvenile) ≤3
Crustaceans
Number of antibiotic treatments127127Crustaceans treated with antibiotics are not eligible for ASC certification. 0
Flatfish
Number of antibiotic treatments ≤3 Number of parasiticide treatments 0
Pangasius
Number of antibiotic treatments ≤3
Salmonids – marine
Number of antibiotic treatments (grow out) ≤3 Number of antibiotic treatments (smolt) ≤3
Seabass, Seabream, Meagre
Number of antibiotic treatments ≤3 (incl. hatchery) Number of parasiticide treatments 1 (incl. hatchery)
Seriola and Cobia
Number of parasiticide treatments 0
Tilapia
Number of antibiotic treatments ≤3
Tropical Marine Finfish
Number of antibiotic treatments ≤3 Number of parasiticide treatments 0
Appendix 1 – Abbreviations and Additional Resources
1.1 Abbreviations
|
Abbreviations |
Term |
|---|---|
|
AB |
Accreditation Body |
|
ABM |
Area-based management |
|
ADCP |
Acoustic Doppler Current Profiler |
|
AF |
Ablation free |
|
AMA |
Area management agreement |
|
AMBI |
AZTI’s Marine Biotic Index |
|
ASC |
Aquaculture Stewardship Council |
|
ASFIS |
Aquatic Sciences and Fisheries Information System |
|
ASI |
Assurance Services International |
|
ATE |
Adverse turnover events |
|
BHQ |
Benthic Habitat Quality |
|
BOD |
Biological oxygen demand |
|
BQI |
Benthic Quality Index |
|
CAB |
Conformity Assessment Body |
|
CAR |
Certification and Accreditation Requirements |
|
CFA |
Continuous flow analysis |
|
Chl-a |
Chlorophyll-a concentration |
|
CIA |
Critically Important Antimicrobials |
|
CO2e |
Carbon dioxide equivalent |
|
CoC |
Chain of Custody |
|
CRM |
Certified reference material |
|
CT |
Clearance time |
|
DCS |
Doppler Current Sensors |
|
DDDO |
Daily diurnal dissolved oxygen |
|
DHA |
Docosahexaenoic acid |
|
DO |
Dissolved oxygen |
|
eFCR |
Economic Feed Conversion Ratio |
|
EICAT |
Environmental Impact Classification for Alien Taxa |
|
EL |
Entry level |
|
EPA |
Eicosapentaenoic acid |
|
EQS |
Ecological quality status |
|
ERA |
Environmental risk assessment |
|
ES |
Enrichment Stage |
|
FAO |
Food and Agriculture Organization |
|
FFDR |
Forage fish dependency ratio |
|
GHG |
Greenhouse gas |
|
GL |
Global level |
|
GMO |
Genetically modified organism |
|
HAB |
Harmful algal bloom |
|
HCVA |
High conservation value area |
|
HIE |
Hydrodynamically isolated embayment |
|
HMP |
Handling Management Plan |
|
HRT |
Hydraulic retention time |
|
HSRA |
Health and safety risk assessment |
|
HWMP |
Health and Welfare Management Plan |
|
IAF |
International Accreditation Forum |
|
IBE |
Institute of Business Ethics |
|
IDH |
Sustainable Trade Initiative |
|
ILO |
International Labour Organisation |
|
IPMP |
Integrated parasite management plan |
|
ISI |
Indicator Species Index |
|
ISEAL |
International Social and Environmental Accreditation and Labelling Alliance |
|
IUCN |
International Union for Conservation of Nature |
|
MLA |
Multilateral recognition arrangement |
|
MP |
Management plan |
|
MPA |
Marine Protected Area |
|
MRL |
Maximum residue limits |
|
MSC |
Marine Stewardship Council |
|
MSCI |
Marine Stewardship Council Licensing Team |
|
NGO |
Non-governmental organisation |
|
NQI |
Norwegian Quality Index |
|
NSI |
Norwegian Sensitivity Index |
|
OHCHR |
Office of the UN High Commissioner for Human Rights |
|
ORP |
Oxidation reduction potential |
|
PA |
Protected area |
|
PAW |
Positive Animal Welfare |
|
PIC |
The Rotterdam Convention on Prior Informed Consent |
|
PL |
Post-larvae |
|
POP |
The Stockholm Convention on Persistent Organic Pollutants |
|
PPE |
Personal protective equipment |
|
PPP |
Phytoplankton primary production |
|
PPT |
Primary production time |
|
PRE |
Protein Retention Efficiency |
|
RAS |
Re-circulating aquaculture system |
|
RT |
Retention time |
|
RW |
Receiving waterbody |
|
SAOB |
Sulfide Anti-Oxidant Buffer |
|
SD |
Secchi disk |
|
SDG |
Sustainable Development Goal |
|
SDS |
Safety data sheet |
|
TAG |
Technical Advisory Group |
|
TAN |
Total ammonia nitrogen |
|
TC |
Total carbon concentration |
|
TN |
Total nitrogen concentration |
|
TOR |
Terms of Reference |
|
TP |
Total phosphorus concentration |
|
TSS |
Total suspended solids |
|
UDHR |
Universal Declaration of Human Rights |
|
UNESCO |
United Nations Educational, Scientific and Cultural Organisation |
|
UNGP |
UN Guiding Principles On Business and Human Rights |
|
UoC |
Unit of Certification |
|
VR |
Variance Request |
|
WEMP |
Water Efficiency Management Plan |
|
WHO |
World Health Organisation |
|
WNMT |
Weighted number of medicinal treatments |
|
WOAH |
World Organisation for Animal Health |
|
WQAC |
Water Quality Advisory Committee |
|
WQMN |
Water Quality Monitoring Network |
|
WUM |
Waterbody unit of management |
1.2 ILO Conventions
|
Number |
Year |
Title |
ASC Farm Standard Criterion |
|---|---|---|---|
|
Eleven Fundamental Instruments relating to ILO Declaration on Fundamental Principles and Rights at Work |
|||
|
29 |
1930 |
3.2 |
|
|
29 |
2014 |
3.2 |
|
|
87 |
1948 |
Freedom of Association and Protection of the Right to Organise Convention |
3.6 |
|
98 |
1949 |
3.6 |
|
|
100 |
1951 |
3.4 |
|
|
105 |
1957 |
3.2 |
|
|
111 |
1958 |
3.4 |
|
|
138 |
1973 |
3.3 |
|
|
155 |
1981 |
3.5, 3.10 |
|
|
182 |
1999 |
3.3 |
|
|
187 |
2006 |
Promotional Framework for Occupational Safety and Health Convention |
3.5 |
|
Other Conventions |
|||
|
95 |
1949 |
3.2, 3.8 |
|
|
131 |
1970 |
3.8 |
|
|
132 |
1970 |
3.9 |
|
|
135 |
1971 |
3.6 |
|
|
155 |
1981 |
3.5 |
|
|
156 |
1981 |
3.4 |
|
|
161 |
1985 |
3.5 |
|
|
169 |
1989 |
3.13 |
|
|
170 |
1990 |
3.5 |
|
|
171 |
1990 |
3.9 |
|
|
181 |
1997 |
3.2 |
|
|
183 |
2000 |
3.8 |
|
|
184 |
2001 |
3.5 |
|
|
190 |
2019 |
3.4, 3.10 |
|
|
R115 |
1961 |
3.11 |
|
|
R116 |
1962 |
3.9 |
|
|
R130 |
1967 |
3.12 |
|
|
R198 |
2006 |
3.7 |
|
1.3 Other conventions and declarations
Appendices
Indicators 4.5
Indicators
Description
4.5.1
4.5.2
4.5.3
4.5.4
Applicable to
4.5.5
Applicable to
4.5.6
Applicable to
4.5.7
4.5.8
4.5.9
Applicable to
4.5.10
4.5.11
4.5.12
Applicable to
4.5.13
4.5.14
Applicable to
4.5.15
4.5.16
4.5.17
Rationale 4.5
Responsible health management is crucial for the wellbeing of cultured aquatic animals, farm viability, and the protection of the surrounding environment and wildlife. Parasites can harm both farmed stock and native species and may spread disease. However, improper use of parasiticides can lead to resistance and contamination. With proper aquatic animal husbandry, monitoring and treatment, these disease risks can be managed.
In areas with multiple farms, collaborative and coordinated management is necessary to reduce disease transfer and prevent resistance to treatments. Sea lice on salmon farms are a particular concern because their proliferation may lead to negative impacts on native salmon or seatrout123123Costello, M. J. (2009). How sea lice from salmon farms may cause wild salmonid declines in Europe and North America and be a threat to fishes elsewhere. Proceedings of the Royal Society B: Biological Sciences, 276(1672), 3385-3394.. Reducing sea lice burden on salmon farms minimises potential impacts on native fish and also benefits the welfare of farmed fish.
This Criterion focuses on ASC-certified farms minimising the risk of transmission to native salmonids by maintaining low sea lice levels on-farm, collaborating on research on native fish stocks, and monitoring and reporting.
Intent – The aquaculture industry actively manages farm sea lice load to reduce risks to native salmonids.
Criterion 4.5 – Parasite Management (Sea Lice)
Scope – Cage culture marine salmonids
Indicators 4.4
Indicators
Description
4.4.1
Applicable to
4.4.2
4.4.3
4.4.4
4.4.5
4.4.6
4.4.7
4.4.8
Applicable to
4.4.9
4.4.10
4.4.11
Applicable to
4.4.12
Applicable to
4.4.13
4.4.14
Applicable to
4.4.15
Applicable to
4.4.16
4.4.17
4.4.18
4.4.19